Waterview Tunnel Project
Transport 340 Super Tee precast beams, maximum weights 70 Tonne, maximum length 36 metres.
Relocation of onsite gantry "Denis" on three separate occasions.
The 'Alice' Tunnel Boring Machine (TBM), which has built two 2.4km underground tunnels on the Waterview Connection project, was dismantled and delivered to the Ports of Auckland