Linton Transformer
Load taken through Taihape.
The load was transferred from 16 axles to 20 axles at Waiouru, then back to 16 axles at Mangaweka, and finally down to 10 axes to get into the site at Linton.
Load taken through Taihape.
The load was transferred from 16 axles to 20 axles at Waiouru, then back to 16 axles at Mangaweka, and finally down to 10 axes to get into the site at Linton.